
Cegelec Transport performed, under tight time constraints to meet the start of the 2006 Winter Olympics Games, the electrical distribition infrastructure (HV, LV) for the Turin (Italy) Automatic Light vehicle underground line. Later, an extension of this line (four more stations) has been been equipped by Cegelec and inaugurated in December 2007. With a length of 9.6 kilometres, the line comprises now 15 stations with a travel time of 15 minutes, end to end.